The pilot is continuously fed by a student housing of about 480 people and two daycare centres of about 90 people each. From the sewer system, the wastewater is pumped to a buffer tank with a volume of 5 m3 and subsequently pumped to a...
Voir les détails de Wastewater Treatment Pilot PlantThe water and environment laboratory has all the necessary equipment to perform physicochemical and (micro) biological analyzes of environmental samples (drinking water, river and lake water, wastewater, soils and sediments), sub-analyzes...
Voir les détails de Water and Environment Laboratory